Environmental Remediation
Project Documents
Lendrum Court
Presentation materials from December 11, 2013 neighborhood meeting
Correspondence from DTSC dated January 9, 2014
Summary notes and slides from January 29, 2014 neighborhood meeting
Armistead Playground Soil Test Results dated February 28, 2014
Technical memorandum dated March 24, 2014
Presentation materials from March 26, 2014 neighborhood meeting
Summary notes from March 26, 2014 neighborhood meeting
North Fort Scott Investigation Summary Report dated July 8, 2014
Final Additional Sampling Work Plan dated August 2014
Remedial Investigation Summary Report dated May 2015
DTSC Approval of Lendrum Court Remedial Investigation Summary Report dated May 19, 2015
Presentation materials from June 18, 2015 public meeting
Final Removal Action Work Plan w/DTSC Record of Approval, Lendrum Court dated July 2015
Presentation Materials from January 7, 2016 Neighborhood Meeting
Presentation Materials from May 17, 2016 Neighborhood Meeting
Revised Remedial Design and Implementation Plan, Lendrum Court, dated May 2016
DTSC Approval of Final Remedial Design and Implementation Plan, dated June 2, 2016.
Buildings 1255 and 1256 Confirmation Sampling Letter Report dated May 17, 2017
Final Construction Completion Report, Lendrum Court dated November 2019
Final Operations and Maintenance Plan, Lendrum Court dated November 2019
Lendrum Court Incinerator Area Land Use Control (LUC Area C) dated May 2021
Lendrum Court Land Use Controls Areas A and B dated May 2022
Lendrum Court Five-Year Review Report_Dec 2023
DTSC Approval_Lendrum Court Five-Year Report dated Dec 2023
Riley Neighborhood
A- Electronic message to Riley Avenue residents 4-12-18
B- EPA-Near Roadway Air Pollution and Health – August 2014
C- ATSDR Public Health Statement – Benzene factsheet – August 2007
D- Electronic message to Riley Avenue residents 4-20-18
E- Table 1 Sub-Slab and Soil Vapor Analytical Results
F- Table 2 Indoor and Ambient-Outdoor Air Analytical Results
G- PowerPoint – Riley Avenue Fuel Distribution System Investigation Update 5-17-2018
H- Updated Table 1 Sub-Slab and Vapor Analytical Results 11-14-18
I- Updated Table 2 Indoor and Ambient-Outdoor Air Analytical Results 11-14-18
J- Revised Feasibility Study and Corrective Action Plan (FS/CAP) 1-17-2020
K- Regional Water Quality Control Board (RWQCB) Approval Letter 1-24-2020
L- Revised Section BR11-1 Supplemental Site Investigation Report 8-2-19
Regional Water Quality Control Board (RWQCB) SSIR approval letter dated October 10, 2019
M- Site-Specific Land Use Control (LUC) Addendum 4-28-2020
N- RWQCB Approval Letter of LUC Addendum 5-6-2020
O- RWQCB issued Determinations of No Unacceptable Risk to Human Health from Soil Vapor Intrusion for:
Units 128B and 129A 6-22-18
Units 128A and 129B 8-16-18
Unit 127A 10-24-18
Unit 127B 12-13-19
P- Construction Completion Report (CCR) Vapor Mitigation System for Unit 127B 8-30-19
Q- RWQCB approval letter for CCR 10-9-19
R- Revised Riley VMS CAP OMMP 6-22-2020
S- RWQCB to Trust Concurrence with Revised OMMP 8-6-2020
T – No Further Action and Discontinuation of Groundwater Monitoring at FDS Section BR11-1
NFA Letter dated 6-8-22
Attachment – Case Closure Summary